Pool Construction Process – Waterfall Pool & Construction
At Waterfall Pool & Construction, we follow a clear and organized process to ensure every pool project is built with quality, efficiency, and attention to detail.
Understanding each phase helps homeowners feel confident and know exactly what to expect from start to finish.

01
Consultation and Planning
Every project begins with a consultation where we discuss your ideas, budget, and overall vision for your backyard.
We review the space, layout, and any site conditions that may affect the design or construction process.
This step helps us understand your goals and guide you in the right direction before moving forward.
02
Design and 3D Rendering
We create a custom design based on your space and preferences.
This includes a 3D rendering so you can clearly visualize the pool, spa, and backyard layout before construction begins.
We adjust the design as needed until everything is finalized and approved.


03
Engineering and Permits
Once the design is complete, we prepare detailed construction plans and engineering.
We submit all required documents to the city for permits and approvals.
Permit timelines vary depending on the city, but this step ensures the project meets all local building codes and requirements.
04
​Excavation
After permits are approved, construction begins with excavation.
We dig the pool according to the approved design and layout.
This phase involves heavy equipment and preparing the site for structural work.


05
Steel (Rebar Installation)
Steel reinforcement is installed to form the structure of the pool.
The rebar is placed based on engineering specifications to ensure strength and durability.
This is a critical phase that determines the long-term integrity of the pool.
06
Plumbing and Electrical
We install all plumbing lines, including returns, suction lines, and spa jets if applicable.
Electrical conduits and bonding are also completed during this phase.
Proper installation here ensures efficient water flow and safe operation of the pool system.


07
Shotcrete (Pool Shell)
4500 PSI Shotcrete is applied to form the structural shell of the pool.
This creates a solid and durable structure that defines the final shape of the pool and spa.
After application, the shell goes through a curing process to reach full strength.
08
Tile and Coping
Tile is installed along the waterline, and coping is installed around the edge of the pool.
This phase adds both functionality and design detail to the project.
Materials can vary based on style, including stone, porcelain, or concrete finishes.


09
Decking and Hardscape
Decking and surrounding areas are completed using materials such as pavers, travertine, or concrete.
This phase ties the pool into the rest of the backyard and creates usable outdoor space.
Proper grading and drainage are also addressed during this stage.
10
Equipment Installation
We install all pool equipment, including pumps, filters, heaters, and automation systems.
This ensures the pool operates efficiently and can be controlled easily.
We focus on reliable and user-friendly systems.


11
Interior Finish (Plaster, Pebble, and Premium Finishes)
The interior finish determines the pool’s color, texture, and durability.
Plaster
-
Smooth and most affordable
-
Lasts about 5–7 years
Quartz (QuartzScape)
-
Stronger than plaster
-
Lasts about 7–10 years
Mini Pebble
-
Durable and natural look
-
Lasts about 10–15 years
-
Offered at no additional cost by Waterfall Pool & Construction
Micro Pebble
-
Smoother finish
-
Similar durability to mini pebble
Premium Finishes (Jewelscape)
-
High-end appearance with added sparkle
-
Most durable and highest cost
Most homeowners choose quartz or pebble finishes for better long-term value.
12
Final Walkthrough
We guide you through the operation of your pool equipment and explain the basics of maintenance.
Our goal is to make sure you are fully comfortable using your new pool.